Âmbito da Intervenção
This work involves: replacement of the bridge’s tensioning rod system and improvement of its behavior by wrapping the rods in a casing; installing cushioners on the longer rods and adjusting the respective force; general rehabilitation of reinforced concrete items in both structures; rehabilitation of the stops and support devices and replacement of those which are most degraded; rehabilitation of the curtain face of sheet piling and beams above the low tide level; general improvement of hydraulic drives; pavement milling and waterproofing of deck; bituminous surface treatment on roads, the respective horizontal and vertical signage; rehabilitation of road lighting and the installation of instruments for the future monitoring/maintenance of the bridge. This work will improve the structural safety of the bridge and the roadway.
Benefícios
-
Structural reinforcement with full replacement of the bridge’s tension rod system;
-
Rehabilitation of the concrete structures of the bridge and access viaduct, repair and painting;
-
Replacement of existing bituminous surface and improvement of driving and comfort conditions;
-
Installation of a new telematics system and a monitoring system for the bridge and replacement of road signage;
-
Installation of new road, decorative and river lighting;
-
Improved driving and safety conditions.